For data centres the standby diesel generator set you need runs from 125 to 2000 kW; Eastern Lion builds these sets around the Cummins, Perkins, Yuchai engines in 50 and 60 Hz, in open frame, silent canopy, trailer, ATS and parallel configurations, and every set is tested at full load before shipment.
How to size the set
Standby duty: the set has to carry the whole connected load plus the starting current, so we size it above the running load. The table below lists the standby ratings of the real models for every typical load of this application.
| Typical load | Standby power to look at | Models that cover it |
|---|---|---|
| 100 kW | 127 – 133 kW | GFS-P159
Engine By Perkins Series · 127 kW GF/GFS-YX161 60HZ Engine By Yuxing Series · 129 kW GF/GFS-YX120 Engine By Yuxing Series · 133 kW |
| 200 kW | 262 – 262 kW | GF/GFS-HC328
Engine By Huachai Series · 262 kW GF/GFS-KF236 Engine By Kofo Series · 262 kW GFS-W328 Engine By Longxin Series · 262 kW |
| 500 kW | 647 – 667 kW | GF/GFS-C582
Engine By Cummins 2 · 647 kW GF/GFS-YC600 Engine By Yuchai Series · 667 kW GF/GFS-WL600 Engine By Woling Series · 667 kW |
| 800 kW | 1000 – 1004 kW | GF/GFS-C900
Engine By Cummins 2 · 1000 kW GFS-P1250 Engine By Perkins Series · 1000 kW GF/GFS-YC904 Engine By Yuchai Series · 1004 kW |
| 1250 kW | 1644 – 2000 kW | GFS-P2056
Engine By Perkins Series · 1644 kW GFS-P2222 Engine By Perkins Series · 1778 kW GFS-P2500 Engine By Perkins Series · 2000 kW |
| 1600 kW | 2000 – 2000 kW | GFS-P2500 Engine By Perkins Series · 2000 kW |
The ratings follow ISO 8528. The final model depends on the voltage, the fuel autonomy, the enclosure and the ambient temperature - send us the load and we will confirm it in writing.
What this application needs
The load the set really has to carry
A data centre is not powered by the servers alone. The generator feeds the whole facility: the IT load, the cooling plant, the lighting, the ventilation, the fire systems and the losses of the distribution itself. Add the starting current of the largest motor that can start while the set is carrying the rest of the plant, and that total is the number the set has to hold.
N+1 is the normal rule
Most data centres are built to N+1: one set more than the load requires, so a single set can be taken out for service while the remaining sets carry the plant. Our tables list the standby rating of every model, because N+1 is decided on the standby figures, not on the prime figures. Where the client runs a 2N design, we quote the sets in matched pairs so that the two halves are identical.
Ten seconds from the signal to the load
The generator has to be on the bus within ten seconds of the failure signal, and the voltage and frequency have to be inside the tolerance that the UPS expects. In practice that means a set that is warm, fuelled and in auto mode at all times, with the batteries on float charge and the coolant above 30 °C. We set the control panel for the start delay, the crank attempt time and the transfer parameters that match the site, and we write them into the quotation.
The voltage and the distribution
Most data centres run a 400/230 V, three phase distribution in the generator room and feed the racks through the UPS, with 6.6 kV or 11 kV only for the incoming side. Sets for 60 Hz markets are built to 400/230 V, 60 Hz with the same alternator and control approach, so the switching gear stays standard. If the plant sits on a medium voltage ring, the step-up transformer and the synchronising equipment are quoted with the sets.
The noise is part of the design
The generator room is often next to the office or the cooling plant, and a bare engine at full load is loud enough to be a problem long before it is a safety issue. The silent canopy set is the usual answer: a steel enclosure with acoustic lining, a radiused inlet and a discharge silencer, which brings the noise down to roughly 70 dB(A) at 7 m. Containerised sets outside the building, with the cable run back to the plant room, work well where the site is tight.
The fuel and the autonomy
Autonomy is quoted from the fuel tank level, as ISO 8528 requires, and 8 to 24 hours at full load is the normal band for a data centre. We can deliver the set with a day tank, a transfer pump, a base tank with a level alarm, and the pipework sized for the distance between the tank and the set.
The paralleling, the ATS and the monitoring
Two to six sets of the same model can be paralleled on a common bus with a parallel control panel, and one set then carries the load while the others are on standby. That is what makes N+1 real: a set can be serviced without touching the load. The automatic transfer switch, the remote monitoring over GSM or Wi-Fi and the fuel and temperature sensors are all quoted with the package, and the site acceptance test is done with a load bank so the load steps are proven before the client takes over.
What we deliver
Open frame or silent canopy, 50 Hz or 60 Hz, ATS or no ATS, single set or a parallel package, with the fuel system, the heaters, the battery charger and the monitoring written into the same quotation. Every set is run at full load in the factory before it is loaded, and the test record travels with the machine.
The series used for this job
Engine By Cummins 2
200 – 1311 kW · 50 Hz · 26 models
View detailsEngine By Perkins Series
7.2 – 2000 kW · 50 Hz · 25 models
View detailsEngine By Yuchai Series
12 – 1378 kW · 50 Hz · 23 models
View detailsEngine By Wuxi Series
48 – 1111 kW · 50 Hz · 22 models
View detailsEngine By Cummins
22 – 444 kW · 50 Hz · 18 models
View details60 HZ Engine By Cummins Series 2
200 – 1222 kW · 60 Hz · 18 models
View detailsQuestions buyers ask about this application
Tell us the load and the site
Send the running load, the voltage and where the set has to run. Our engineers answer with the model, the layout and the price within one working day.